References

We have implemented dozens of projects with proven results. We are trusted by the largest operators of swimming pools and water parks.

Public pool STARS Třinec

Public pool STARS Třinec

  • REWAT OT15
  • Output: 5 400 m³/year
  • Realization: 2025
PARK HOTEL BENICE

PARK HOTEL BENICE

  • REWAT OT10
  • Output: 10 m³/year
  • Realization: 2025
Wellnes resort Nova Vista – Lower Moravia

Wellnes resort Nova Vista – Lower Moravia

  • REWAT OT80
  • Output: 28 000 m³/year
  • Realization: 2025
Swimming pool Tabor

Swimming pool Tabor

  • REWAT OT20
  • Output: 7 500 m³/year
  • Realization: 2024
SPA Aquaforum Franzensbad

SPA Aquaforum Franzensbad

  • REWAT OT50
  • Output: 18 000 m³/year
  • Realization: 2024
SAREZA OSTRAVA

SAREZA OSTRAVA

  • REWAT OT100
  • Output: 35 000 m³/year
  • Realization: 2024
AQUALAND MORAVIA

AQUALAND MORAVIA

  • 2 x REWAT OT100
  • Output: 18 000 m³/year
  • Realization: 2024
AQUALAND MORAVIA

AQUALAND MORAVIA

  • REWAT OT50 GEO geothermal water
  • Output: 16 000 m³/year
  • Realization: 2023
Aquapark Rakovnik

Aquapark Rakovnik

  • REWAT OT80
  • Output: 28 000 m³/year
  • Realization: 2023
Aquapark Beroun

Aquapark Beroun

  • REWAT OT100
  • Output: 35 000 m³/year
  • Realization: 2022
Zlin Municipal pool

Zlin Municipal pool

  • REWAT OT100
  • Output: 30 000 m³/year
  • Realization: 2022

10+

recycling lines in operation

750 000

liters of water saved per day

5 300

kilograms of CO₂ carbon footprint reduction per day

13 933

kWh of daily energy savings from heating refill water

They are counting on us

  • AQUALAND MORAVIA
  • Spa Zlin
  • PAWLIK AQUAFORUM
  • Tipsport laguna
  • tzmt